CHAKARI GOLD DUMP - Free

• Private company has a 1.5 million gold dump in the Chakari, Kadoma area about 160km from Harare.
• Preliminary lab analysis done on the gold dump has shown values varying from 1.25gr/ton to 1.48gr/ton on the upper level of the dump.
• Drilling is currently being done to establish gold levels on the lower levels of the dump and to establish the depth of the gold dump foundation.
• The company I looking at an investor to come up with the finances to set up a processing plant and fund to cover the running costs of operation with the capacity to run this operation in the shortest of time.
• At least a 1000 tonnes of gold ore are on the ground and company will entertain a JV .
• A solid transport network, electricity and water source available.

Leave a Reply

Your email address will not be published. Required fields are marked *

Contact Owner

+263-...+263-8644 117303View number

Human test. Please input the result of 5+3=?

\
Category Partnerships Added Dec 13, 2016 Location Kadoma Views 378 Rating
1 Star2 Stars3 Stars4 Stars5 Stars
Loading...
@ 2018 Copyrights Reserved. ZimMinerals Mining Platform.